AOK_4460__7-25-2016

Facility

  • World-class, secure 118 acre Drilling and Production Test facility 5 miles South of Stillwater, Oklahoma on Hwy 177. 68 miles from Oklahoma City, 75 miles from Tulsa.
  • Managed by over 80 years of drilling testing, drilling engineering experience
  • On site computer and communication support with fiber connectivity.
  • Back-up drilling support by a large Oklahoma Drilling Contractor
  • Open 24 hours per day, 7 days per week, 364 days/year for testingexterior
  • No surcharges for operating nights, weekends or holidays.
  • Access to senior personnel 24 hours per day while testing
  • Security on site 24/7/365

  • Varied lithology and a deep basement (over 6500 feet).
  • Facilities for drilling and production testing
  • Over 2000 ft of lateral drilling possible
  • One fully equipped triple-mast drilling rig:
  • Rig 10 = N-46 draw works manufacturer rating of 900 Hp. p/b (2) Cat C-15 diesel engines rated at 475 hp each. 450,000 # static hook load with 350,000 # set back. 138 foot derrick
  • 3 x 1000 Hp Triplex Pumps
  • 250 Ton top drive
  • 4 Vortex high-speed linear shale shakers
  • High speed centrifuge
  • 9-5/8″, 13-3/8″ surface casing available. More to come.
    interior-2
  • High-pressure pump, low volume triplex pump (HT400)
  • 12 inch Make-out, break-out machine available at no charge
  • 3.5”, 4” and 4.5” Drill Pipe and comparable HWDP available at no additional cost
  • 6-1/4″ and 8” Drill Collars available at no additional cost
  • Over 30,000 sf. of open shop for customer use.
  • Shops are complete with 5 ton overhead and swing cranes
  • 450 sq ft and 144 sq ft conference rooms available
  • Access to private, secure, modern, well-equipped office space
  • In-building storm shelters.

  • Safety is a priority protocol.
  • Complete, implemented and maintained safety program
  • Safety trained crews and staff; regular scheduled safety meetings and daily safety orientations while drilling / testing.
  • Full time safety management team.
  • Regular un-announced drug and alcohol monitoring
  • ISO-9001 certification (in process)
  • Welding shop with certified on- call welder.
  • Fully equipped mud lab to enable testing of both oil and water based drilling fluids
  • On site mud engineers available if needed
  • Secure and comprehensive data acquisition system onsite and with remote availability.
  • Each customer will be assigned their own secure IP address code for extra security.
  • Multiple WITS inputs for customers
  • Rolling stock equipment include various forklifts, Skytrak, Skid Steers and crane(s).

 

Available on-site

  • Fully equipped machine shop complete with:
    • 60” Milltronics Mill, 3 State of the art programmable lathes, Omax Abrasive Water Jet cutter and more….
  • Large Welding / Fabrication shop
  • 1400 sq ft Training room
  • Monel collars

interior

  • Rig 17 = N-46 draw works manufacturer rating of 900 Hp. p/b (2) Detroit 60 series diesel engines rated at 535 hp each. 450,000 # static hook load with 300,000 # set back. 138 foot derrick
  • 3 x 1000 Hp Triplex pumps
  • 250 Ton top drive
  • 16 additional Surface hole casings set
  • 400 – 1000 feet of surface casing; 20”, 13-3/8”, 9-5/8” and 7 inch
  • Two inch Coiled Tubing Unit
  • Production testing facilities
  • Many cemented casing strings for ESP, packer and liner testing
  • Cased horizontal test hole available for testing drilling and production equipment. (by 3rd qtr, 2017)
  • 400 feet of heated/pressurized 20” Surface Casing (by 3rd qtr, 2017)
  • 1400 sq ft conference / training room;
  • In ground / above ground flow loop.
  • Ability to use Oil-Based drilling fluid.
  • Separate storage tanks for on-site OBM.